Item Infomation

Full metadata record
DC FieldValueLanguage
dc.contributor.authorHai-Qing, Chen-
dc.contributor.authorYu-De, Dong-
dc.contributor.authorFei, Hu-
dc.date.accessioned2023-04-27T07:20:54Z-
dc.date.available2023-04-27T07:20:54Z-
dc.date.issued2023-
dc.identifier.urihttps://link.springer.com/article/10.1186/s42492-023-00134-7-
dc.identifier.urihttps://dlib.phenikaa-uni.edu.vn/handle/PNK/8354-
dc.descriptionCC BYvi
dc.description.abstractBased on the existing plant layout and process flow, a simulation analysis was conducted using the Plant Simulation platform with the utilization efficiency of each station and production capacity of the dismantling system as indicators. A problem with long-term suspension in the disassembly process was determined. Based on the two optimization directions of increasing material transportation equipment and expanding the buffer capacity, a cost-oriented optimization model is established. A genetic algorithm and model simulation were used to solve the model. An optimization scheme that satisfies the production needs and has the lowest cost is proposed. The results show that the optimized dismantling system solves the suspended work problem at the dismantling station and a significant improvement in productivity and station utilization efficiency compared with the previous system.vi
dc.language.isoenvi
dc.publisherSpringervi
dc.subjectcrap wagon dismantling systemvi
dc.subjectPlant Simulationvi
dc.titleSimulation and optimization of scrap wagon dismantling system based on Plant Simulationvi
dc.typeBookvi
Appears in Collections
OER - Công nghệ thông tin

Files in This Item: